RISK ASSESSMENT FORM


Production Name & Number    -  SamGoodfellowFILM
Shoot Dates                               -  04/05/2014 
Production Manager                  - Sam Goodfellow
Producer                                    - Sam Goodfellow


Guidance:


  1. Assess whether a hazard will be present, write YES or NO.  Then for each hazard that you have said YES to do the following:
  2. Rate each risk on a Severity scale from Negligable (N), Low risk (L), Moderate risk (M), Severe (S), Very severe (V)
  3. Rate each risks Likelihood on scale from Very unlikely (VU), Unlikely (U), Possible (P), Likely (L), Very likely (VL)
  4. Determine the Risk Factor from the table overleaf.


P = Present    /    S = Severity    /    L = Likelihood    /    R = Risk Factor   



Hazard
P
S
L
R
1
Alcohol/drugs
NO
S
VU
2
Animals/insects
NO
L
VU
1
3
Audiences
YESLU
2
4
Camera cable/grip equipment
NOLVU
1
5
Confined spaces
NOMVU
6
Derelict buildings/dangerous structures
NOVVU
7
Electricity/gas (other than normal supplies)
NOSVU
8
Fatigue/long hours
NOMVU
9
Fire/flammable materials
NOVVU
10
Hazardous substances
NOSVU
11
Heat/Cold/extreme weather
NOMVU
12
Laser/strobe effects
NOMVU
13
Machinery/industrial/ crane/hoist
NOVVU
14
Materials - glass, non-fire retardant set materials
NOSVU
15
Night operation
NOMVU
16
Noise – high sound levels
NOLVU
17
Non standard manual handling
NOMVU
18
Public/crowds
NOMVU
19
Radiation
NOVVU
20
Scaffold/Rostra
NOSVU
21
Smoking on set
NOMVU
22
Special effects/explosives
NOVVU
23
Special needs (elderly, disabled, inexperienced)
NOLVU
24
Specialised rescue/first aid
NOMVU
25
Stunts, dangerous activities
YESMP
26
Tall scenery/suspended ceilings
NOMVU
27
Vehicles/speed
NOSVU
28
Water/proximity to water
NOSVU
29
Weapons
NOSVU
30
Working at heights
NOMVU
31
Working overseas
NONVU
32
Other risks
YESMP

5. Calculate the Risk Factor:


Very Unlikely

Unlikely
Possible
Likely
Very Likely
Very severe
3
4
4
5
5
Severe
2
3
3
3
5
Moderate
2
2
3
3
3
Low Risk
1
2
2
3
3
Negligible
1
1
2
2
3

6. Decide the action to take:

5
Very severe
Take immediate action
4
Severe
High priority
3
Moderate Risk
Programme for action
2
Low Risk
Action may be required
1
Negligible
Probably acceptable


7. Then list each risk identified

Hazard Number:
3
Description of Hazard:
Audiences
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )
Cast and crew
Action to take:

Action may be required - there will be two of my family members in the house while filming, they will stay out of the way. However in a rare circumstance they could walk in shot and trip over hurting someone or themselves. To avoid this I will put up signs on the door and shut the door when we are filming in particular rooms.
Person/company responsible for action
Myself
Hazard Number:
25
Description of Hazard:
Stunts, dangerous activities
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )
Cast
Action to take:
Programme for action - for one of my scenes in the house, my character Liam has to drag Luke's dead body. To make sure this is as safe as possible, I will get my actor playing Luke to drag himself along with Liam so that he isn't actually being dragged. It will also be on the grass so it will be soft so neither should injure themselves.
Person/company responsible for action
Myself
Hazard Number:
32
Description
Slippery floorboards
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )
Cast and crew
Action to take:
Programme for action - the floorboards on location can be quite slippery if you are wearing thick socks. So to make sure no one falls over or trips, I will make sure all my cast and myself wear shoes/trainers inside. This so to avoid that they don't fall over.
Person/company responsible for action
Myself
 

 

 

 

 

 

 
 
 

 

 
 


To be completed at agreed later date -





Exposed person(s) informed? (y/n)
Y
Agreed action taken? (y/n)
Y
Risk removed? (y/n)
Y



Completed by: Sam Goodfellow              Position: Writer, director and producer


Signature                                                Date: Friday the 2nd of May 2014

No comments:

Post a Comment